Three-machine unit-job scheduling with precedence constraints (Garey-Johnson OPEN8): is P3|prec,p_j=1|Cmax in P?

Theorem 1.1: a uniform deterministic algorithm constructs a minimum-makespan schedule for unit-length jobs with arbitrary precedence constraints on three identical machines, and decides feasibility for a deadline 1≤T≤n1\le T\le n exactly, in O((L+2)150020)O((L+2)^{150020}) Turing machine steps. The method decomposes schedules into gaps whose job sets have bounded-size global Boolean descriptions and searches them by dynamic programming. The exponent is astronomically large and no practical claim is made. It does not settle m≥4m\ge4 fixed machines, which remains open.

Exact FrontierDelta

Prior state unknown→proved

Scope and record

Occurred: Sep 24, 2026

Delta type: SOURCE CLAIM

Assumptions: VibeMathed verification: lean-checked. Publication: announcement. AI contribution: ai-discovered. VibeMathed editorial classifications, scores, notes, relations, and dataset structure are CC BY 4.0. Source statements and linked content retain their own rights.

Canonical aliases: Three-machine unit-job scheduling with precedence constraints (Garey-Johnson OPEN8): is P3|prec,p_j=1|Cmax in P? · P3|prec,pj=1|Cmax

Confidence: Not scored

Registry verification: lean checked · announcement · candidate

Open the source record ↗

Attribution

VibeMathed
registry · event recorded by

Unreleased internal OpenAI model
model · ai model contributor · OpenAI

Artifacts and verifiers

Lean proof (OAI.ThreeMachine.main_theorem)

lean artifact · pending

Artifact ↗
Comparator statement: ThreeMachine.lean

lean artifact · pending

Artifact ↗

Compute record

No linked compute attempts recorded.

Lineage and corrections

This event attributed to Unreleased internal OpenAI model

Theorem 1.1: a uniform deterministic algorithm constructs a minimum-makespan schedule for unit-length jobs with arbitrary precedence constraints on three identical machines, and decides feasibility for a deadline 1≤T≤n1\le T\le n exactly, in O((L+2)150020)O((L+2)^{150020}) Turing machine steps. The method decomposes schedules into gaps whose job sets have bounded-size global Boolean descriptions and searches them by dynamic programming. The exponent is astronomically large and no practical claim is made. It does not settle m≥4m\ge4 fixed machines, which remains open. parent of this event

Comparator statement: ThreeMachine.lean evidence for this event

Three-machine unit-job scheduling with precedence constraints (Garey-Johnson OPEN8): is P3|prec,p_j=1|Cmax in P? evidence for this event

Three-machine unit-job scheduling with precedence constraints (Garey-Johnson OPEN8): is P3|prec,p_j=1|Cmax in P? parent of this event

Lean proof (OAI.ThreeMachine.main_theorem) evidence for this event

VibeMathed record: Three-machine unit-job scheduling with precedence constraints (Garey-Johnson OPEN8): is P3|prec,p_j=1|Cmax in P? evidence for this event

Act on this frontier

Verify, challenge, or extend the result.