Indexed metadata

The Complexity of Flowshop and Jobshop Scheduling

M. R. Garey, D. S. Johnson, Ravi Sethi

Source record

Source: Crossref

Published: May 1, 1976

DOI: 10.1287/moor.1.2.117

Open original source ↗

Source abstract

NP-complete problems form an extensive equivalence class of combinatorial problems for which no nonenumerative algorithms are known. Our first result shows that determining a shortest-length schedule in an m-machine flowshop is NP-complete for m ≥ 3. (For m = 2, there is an efficient algorithm for finding such schedules.) The second result shows that determining a minimum mean-flow-time schedule in an m-machine flowshop is NP-complete for every m ≥ 2. Finally we show that the shortest-length schedule problem for an m-machine jobshop is NP-complete for every m ≥ 2. Our results are strong in that they hold whether the problem size is measured by number of tasks, number of bits required to express the task lengths, or by the sum of the task lengths.

Evidence graph

No public relationships recorded yet.

Integrity note: This page is a factual metadata record created by deterministic ingestion. It is not a claim that the work moves a mathematical frontier or has been independently verified.

The Complexity of Flowshop and Jobshop Scheduling — Mathematical Frontier Network