DynaSPLIT: Strong tail-optimal scheduling for the M/G/n with heavy-tailed job sizes
Zhouzi Li, Mor Harchol-Balter, Alan Scheller-Wolf
Source abstract
We study the asymptotic response time tail in the M/G/n queue with heavy-tailed (regularly varying) job sizes. For this setting, strongly tail optimal policies are known only at lower load, where n-1 servers suffice for stability. At higher load, the tail optimal scheduling has been open. This paper presents DynaSPLIT, the first strongly tail optimal policy at high load. Together with prior work, this result shows that strong tail optimality is achievable across the entire stability region of the M/G/n with heavy-tailed job sizes.
Evidence graph
No public relationships recorded yet.
Integrity note: This page is a factual metadata record created by deterministic ingestion. It is not a claim that the work moves a mathematical frontier or has been independently verified.