Planning Allocation for GTO-GEO Transfer Spacecraft with Triple Orthogonal Gimbaled Thruster Boom
Guangfu Ma, Xianglong Kong
Source abstract
This paper proposes an electric propulsion platform based on a triple orthogonal gimbaled thruster boom to realize the GTO-GEO transfer process. The adjustment mechanism of the gimbaled thruster boom significantly improves the range of thrust vector variation enhances the efficiency of thrust vector adjustment, and reduces the spacecraft burn-up. Additionally, to achieve the application performance, a planning allocation method based on the model prediction algorithm is proposed and verified through numerical simulation.
Evidence graph
No public relationships recorded yet.
Integrity note: This page is a factual metadata record created by deterministic ingestion. It is not a claim that the work moves a mathematical frontier or has been independently verified.