A Hybrid Multiobjective Genetic Algorithm for Robust Resource‐Constrained Project Scheduling with Stochastic Durations
Jian Xiong, Ying-wu Chen, Ke-wei Yang, Qing-song Zhao, Li-ning Xing
Source abstract
We study resource‐constrained project scheduling problems with perturbation on activity durations. With the consideration of robustness and stability of a schedule, we model the problem as a multiobjective optimization problem. Three objectives—makespan minimization, robustness maximization, and stability maximization—are simultaneously considered. We propose a hybrid multiobjective evolutionary algorithm (H‐MOEA) to solve this problem. In the process of the H‐MOEA, the heuristic information is extracted periodically from the obtained nondominated solutions, and a local search procedure based on the accumulated information is incorporated. The results obtained from the computational study show that the proposed approach is feasible and effective for the resource‐constrained project scheduling problems with stochastic durations.
Evidence graph
No public relationships recorded yet.
Integrity note: This page is a factual metadata record created by deterministic ingestion. It is not a claim that the work moves a mathematical frontier or has been independently verified.