Indexed metadata

Reliability modeling for a repairable (k1, k2)-out-of-n: G system with phase-type vacation time

Guirong Wang, Linmin Hu, Tingting Zhang, Yuyu Wang

Source record

Source: Crossref

Published: Mar 1, 2021

DOI: 10.1016/j.apm.2020.08.071

Open original source ↗

Evidence graph

No public relationships recorded yet.

Integrity note: This page is a factual metadata record created by deterministic ingestion. It is not a claim that the work moves a mathematical frontier or has been independently verified.

Reliability modeling for a repairable (k1, k2)-out-of-n: G system with phase-type vacation time — Mathematical Frontier Network