A mathematical formulation and an NSGA-II algorithm for minimizing the makespan and energy cost under time-of-use electricity price in an unrelated parallel machine scheduling

Marcelo F. Rego, Júlio Cesar E.M. Pinto, Luciano P. Cota, Marcone J.F. Souza

Source record

Source: Crossref

Published: Feb 3, 2022

DOI: 10.7717/peerj-cs.844

Open original source ↗

Source abstract

In many countries, there is an energy pricing policy that varies according to the time-of-use. In this context, it is financially advantageous for the industries to plan their production considering this policy. This article introduces a new bi-objective unrelated parallel machine scheduling problem with sequence-dependent setup times, in which the objectives are to minimize the makespan and the total energy cost. We propose a mixed-integer linear programming formulation based on the weighted sum method to obtain the Pareto front. We also developed an NSGA-II method to address large instances of the problem since the formulation cannot solve it in an acceptable computational time for decision-making. The results showed that the proposed NSGA-II is able to find a good approximation for the Pareto front when compared with the weighted sum method in small instances. Besides, in large instances, NSGA-II outperforms, with 95% confidence level, the MOGA and NSGA-I multi-objective techniques concerning the hypervolume and hierarchical cluster counting metrics. Thus, the proposed algorithm finds non-dominated solutions with good convergence, diversity, uniformity, and amplitude.

Evidence graph

No public relationships recorded yet.

Integrity note: This page is a factual metadata record created by deterministic ingestion. It is not a claim that the work moves a mathematical frontier or has been independently verified.