Indexed metadata

Multi-steps integrated mathematical MCDM model for construction material selection of Addis Ababa high-rise building infrastructure

Tamene Taye Worku

Source record

Source: Crossref

Published: Mar 15, 2024

DOI: 10.1080/21650020.2024.2329201

Open original source ↗

Evidence graph

No public relationships recorded yet.

Integrity note: This page is a factual metadata record created by deterministic ingestion. It is not a claim that the work moves a mathematical frontier or has been independently verified.